in Denpasar Indonesia  sales   price   shop   near me   near me shop   factory   supplier 2016 Newest Wheel Loader for Sale manufacturer   best   Cost   Custom   Cheap   wholesaler

Thanks to our broad merchandise range and prosperous encounters in this sector, “We are constantly serving our clients with our very best products.” Ever-Power Group CO., LTD. IS Expert IN Producing ALL Kinds OF MECHANICAL TRANSMISSION AND HYDRAULIC TRANSMISSION LIKE: PLANETARY GEARBOXES, WORM REDUCERS, IN-LINE HELICAL Equipment Pace REDUCERS, PARALLEL SHAFT HELICAL Equipment REDUCERS, HELICAL BEVEL REDUCERS, HELICAL WORM Gear REDUCERS, AGRICULTURAL GEARBOXES, TRACTOR GEARBOXES, Vehicle GEARBOXES, PTO Drive SHAFTS, Unique REDUCER & Associated Gear Components AND OTHER Connected Items, SPROCKETS, HYDRAULIC Technique, VACCUM PUMPS, FLUID COUPLING, Equipment RACKS, CHAINS, TIMING PULLEYS, UDL Velocity VARIATORS, V PULLEYS, HYDRAULIC CYLINDER, Equipment PUMPS, SCREW AIR COMPRESSORS, SHAFT COLLARS Minimal BACKLASH WORM REDUCERS AND SO ON. 2016 most recent wheel loaEPTfor sale

Our benefits colon

-We generate most of the elements in our own manufacturing unit comma greater to management the high quality comma easier to get parts in the EPT
-Genuine guarantee for quality colon we will provide elements as free within guarantee if top quality issue
-EPT encounters in this industry colon we commenced to exporting loaders from calendar year 2008 interval

Functions of this model 3ton loader colon

1 rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT engine with significantly less oil use comma reduced noise and small emissions time period
two rpar EPT and torque converter of 5 ton wheel loaEPTare of great applicability time period
three rpar Optimally made doing work unit and frames of wheel loaEPTare more powerful and far more sturdy interval
4 rpar EPT obligation unloading EPT system enhances the EPT wheel loaEPTperformance period
5 rpar The wheel loaEPTuses very best EPT cylinders comma pumps and valve interval

Information colon

1 rpar EPT motor comma 130HP comma 6 cylinders comma 4 strokes comma water cooling comma turbocharged comma EPT guarantee interval ZL50 planetary sort EPT with EPT converter comma 2 EPT and 1 reverse speeds comma identical as 5ton wheel loader comma much better for large obligation period EPT EPT change period EPT axles with caliper sort provider brake period of time

2 rpar The robotically welded two-piece structural frame style gives a rugged and reputable basis for the EPT that enhances security comma functionality comma and serviceability period of time A strong articulating hitch method joins the front and rear frames strengthening sturdiness interval Enhanced line routings across the hitch joint streamline the producing procedure and enhance reliability and sturdiness interval

three rpar EPT structural components are all developed by EPT period All the parts are higher high quality welded interval The ball blasting and vibration treatment method can launch the welding stress interval UT lparEPT Testing rpar to examine the welding defect period It will sort a great deal of small pits on the surface following blasting and it will boost the paint adhesion period

four rpar The strong axle utilizes a main EPT and two hub EPTs which are related by two shafts time period The major EPT employs EPTl EPTs and the hub EPT uses planet EPTs time period Dry type caliper brake uses a brake shoe with a brake disc period It is much better for servicing and radiation period

5 rpar The radiating area of the substantial quality radiator is included for much better radiation period of time The temperature of the motor and the EPT can be controlled unEPTthe temperature limits period of time It extends the service life equally of the engine and the EPT period And it minimizes the oil leak of the hoses and meanwhile the support lifestyle of hoses is extended as well period

six rpar Luxury cabin is outfitted the two air conditioner and electric fan time period Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd period of time The spacious cabin assures the relaxed procedure and relaxation environment for the operators period of time

seven rpar Single EPT EPTstick management is optional time period The EPTstick can be moved EPT and again to control the boom lifting and down period of time The EPTstick can be moved remaining and rigEPT to handle the bucket dumping and loading period It is simple for operation and the performance is significantly increased than the two EPT manage system interval

eight rpar The steering wheel placement can be a little altered period of time The instrument panel is composed the meter of h2o temperature comma the meter of oil temperature comma the meter of gasoline level comma the meter of air pressure and the counter of doing work several hours period of time The switches for lights are merged in the panel also period

Optonal attachments
-coal bucket
-rock bucket
-rapid alter hitch
-wooden grapple
-grass grapple
-pallet fork

Loading and deal
-one device for every 40HQ container or 2 units in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a steel body
-primary physique EPTd into container immediately
-fixed with specialist steel ropes

Guarantee and servce colon

one rpar A single year warranty for EPT EPT period of time
two rpar All spare parts are obtainable as we create most of the components in our manufacturing facility period
three rpar We can supply complex help via mail comma phone comma video clip or sending engineers there period of time
four rpar EPT operation and maintenance manul and areas list are transported with the loaders time period

Our items selection colon

We generate wheel loaders with bucket capability from 1 period8m3 to 3m3 interval
We also produce excavators from 1 period8ton to 42ton period
All EPTs are CE certificated period of time

Our manufacturing facility tour colon
We generate most of the elements and it is much better for top quality handle method time period And it is simple to get the spare elements from us immediately way too interval

Technical specs colon

Basic Data
Bucket ability one period8 m sup3
Rated load 3200 kg
Operation weight 12440 kg
Dumping top 3060 mm
Dumping achieve 1008 mm
Breakout drive 97 kN
Traction drive a hundred kN
Wheel base 2750 mm
Complete EPT cycle time ten period3 s
Total bucket lifting time five period6 s
Min time period turning radius 5376 mm
All round dimension lparL timesW timesH rpar 6970 times2450 times3228 mm
Engine
Model CUMMINS 6BT5 period9-C130
Rated EPT 97 kw
Rated speed 2200 rpm
Max time period torque 560 N periodm
Gasoline use 225 g solkw periodh
EPT Technique
Gear box sort planetary EPT shift
EPT speed I twelve km solh
EPT pace II forty km solh
Reverse velocity seventeen km solh
Torque converter kind one stage 4 factors
Axle type four-wheel EPT
Tire dimension seventeen period5-25-12PR

  in Denpasar Indonesia  sales   price   shop   near me   near me shop   factory   supplier 2016 Newest Wheel Loader for Sale manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Denpasar Indonesia  sales   price   shop   near me   near me shop   factory   supplier 2016 Newest Wheel Loader for Sale manufacturer   best   Cost   Custom   Cheap   wholesaler