Service & Good quality controlWe source in depth drawings and provide anytime needed. Keeping in brain that good support is the important to cooperating with consumers, we strive to fulfill large quality expectations, offer you aggressive costs and make certain prompt shipping and delivery. In 2008, it was awarded with “Countrywide Export Commodity Inspection-cost-free Business”.
RV sequence Traits
- RV – Sizes:030-040-050-063-075-one hundred and five-a hundred and ten-130-a hundred and fifty
- Input Choices: with enter shaft, With Sq. flange,With Input Flange
- Input EPT .06 to eleven kW
- RV-Dimension from 030 to 105 in die-solid aluminium alloy budy and in excess of one hundred ten in solid iron
- Ratios in between five and a hundred
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium models are supplied complete with synthetic oil and enable for EPT mounting positions, with no want to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimension 030 and in excess of are painted with RAL 5571 blue
- Worm EPT EPTs are available with diffferent mixtures: NMRV NMRV, NMRVEPT NMRV, JWB NMRV
- NMRV, NRV VS,NMRV AS,NMRV VS,NMRV F
- Alternatives: torque arm, output flange, viton oil seals, low/high temperature oil, filling/drain/breather/degree plug,Little hole
Basic models can be utilized to a extensive range of EPT reduction ratios from 5 to a thousand.
Warranty: One calendar year from date of shipping and delivery.
WORM EPT | |||||
SNW Series | Output Pace Range: | ||||
Variety | Previous Type | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | phi14 | Applicable EPT EPT: | |
SNW040 | RV040 | 45N.m | phi19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | phi25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | phi25 | With Inline AC EPT | |
SNW075 | RV075 | 230N.m | phi28 | Input Options2: | |
SNW090 | RV090 | 410N.m | phi35 | With Square flange | |
SNW105 | RV105 | 630N.m | phi42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | phi42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | phi45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | phi50 | With Input Flange |
EPT Drive
ZheJiang EPT Travel Co.,Ltd,the predecessor was a condition-owned military mould EPTrprise, was estabEPTd in 1965. EPT EPTizes in the full EPT EPT resolution for substantial-finish tools production EPT dependent on the intention of quotPlatform Merchandise, Application Design and Skilled Service quot.
EPT have a sturdy technical power with in excess of 350 workers at present, incXiHu (West Lake) Dis.Hu (West Lake) Dis. in excess of thirty engineering professionals, thirty quality inspectors, covering an spot of 80000 sq. meters and sorts of EPT processing EPTs and tests equipments. We have a good foundation for the industry application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and service of higher-stop velocity EPTs amp variators owning to the provincial engineering EPT research cEPTr,the lab of EPT speed EPTs, and the base of contemporary R ampD.
Our Staff
EPT Control
EPT:Insist on EPTrovement,Attempt for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of products production indurstry,consumer never ever satirsfy with the present good quality of our products,on the opposite,wEPT the worth of top quality.
EPT policy:to enhance the all round level in the discipline of EPT EPT
EPT See:Steady EPTrovement , pursuit of excellence
EPT Philosophy:EPT EPTs worth
three. Incoming EPT Manage
To build the AQL satisfactory degree of incoming material management, to give the content for the EPT inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd merchandise to take return, check, rework, rework inspection liable for monitoring bad, to keep track of the provider to consider corrective measures
to stop recurrence.
4. Approach EPT Handle
The manufacturing website of the very first evaluation, inspection and final inspection, sampling in accordance to the demands of some initiatives, judging the top quality adjust trend
discovered irregular phenomenon of production, and supervise the generation division to boost, eliminate the abnormal phenomenon or point out.
five. FQC(Last QC)
Following the production department will comprehensive the merchandise, stand in the customer’s position on the finished merchandise good quality verification, in get to make certain the high quality of
customer anticipations and wants.
six. OQC(Outgoing QC)
After the item sample inspection to deterEPT the experienced, permitting storage, but when the finished item from the warehouse prior to the formal delivery of the goods, there is a examine, this is named the shipment inspection.Check content:In the warehouse storage and transfer position to confirm, even though confirming the shipping and delivery of the merchandise
is a product inspection to deterEPT the qualified items.
EPT
Delivery